centum 3000 and new PCs problems

hi dear

in our gas refinery we use centum 3000 r4. we need to buy some pcs for server with windows 2003 support and at least 8 gigabyte ram 250 G hard drive raid support motherboard. we couldn't find this config so we decided to upgrade centum 3000 to centum vp. is it possible ?
how much we should pay for key-code or older one is sufficient?or other suggestion?
centum vp support windows 7 and new PCs support windows 7
02-11-2014 04:09 AM
Top #2
Abdul Wahab Asif, TÜV FS Professional
02-11-2014 04:09 AM
Please contact OEM (Yokogawa). I am sure they will be able to provide you the required PCs (Sysems) for Centum 3000.
02-11-2014 06:24 AM
Top #3
Abdul Wahab Asif, TÜV FS Professional
02-11-2014 06:24 AM
Yes, upgrade from Centum 3000 to Centum VP is possible. I am not sure how much that will cost but you can check with OEM or some system integrator to propose you a solution.
02-11-2014 09:05 AM
Top #4
Abdul Wahab Asif, TÜV FS Professional
02-11-2014 09:05 AM
https://www.yokogawa.com/dcs/download/dcs-download-vp-en.htm
02-11-2014 11:50 AM
Top #5
Richard Dambaugh
02-11-2014 11:50 AM
You could get VM Ware workstation and set Centrum up in it to run under the native version of windows. Keep in mind you will need more RAM but amazingly it should run about as fast if not faster.
02-11-2014 01:59 PM
Top #6
ali Panahi
02-11-2014 01:59 PM
I KNOW but use this server in gas refinery it is critical we cant use vmware.
02-11-2014 04:48 PM
Top #7
Rafael Carrasco
02-11-2014 04:48 PM
Hello Ali:

It is not good idea to use VM Ware.
I recommend you contact to YOKOGAWA Technical support for a general evaluation of the system.
Licenses are not a serious problem for an upgrade, but will need to use new interface cards in all HIS. Possibly you may have to use VNET/IP interface card for each HIS.
Will be necessary to check if the communication modules are able to use CENTUM VP or going to requiere change to the nodes.
The upgrade system from CENTUM3000 to CENTUM VP is not only a matter of changing PCs.
Best Regards,
02-11-2014 07:31 PM
Top #8
ali Panahi
02-11-2014 07:31 PM
thank you Rafael and all other friends participate in this discussion .
can any body suggest one suitable hardware configuration(motherboard ,ram , raid card , hard )?
thank you
02-11-2014 09:42 PM
Top #9
Cesar Zuñiga
02-11-2014 09:42 PM
I have used SIEMENS servers And i have no complaints , the ones we own actually run windows 2003 server, take look http://www.automation.siemens.com/mcms/pc-based-automation/en/industrial-pc/rack-pc/simatic-ipc547d/pages/default.aspx
02-12-2014 12:11 AM
Top #10
BRUCE FRENCH
02-12-2014 12:11 AM
Suggest you contact Yokogawa, they have standard approved PC configurations for their systems and will be able to provide you with these.
02-12-2014 02:15 AM
Top #11
Ankur Naik
02-12-2014 02:15 AM
An upgrade from CS3000 to Centum VP is possible but will require extensive support from the OEM. They also have recommended server configurations and manufactures which I would recommend adhering to. Upgrading the VNET/IP cards to the new PCIexpress versions will be required if your old machines use PCI
07-15-2014 09:42 AM
Top #12
Ariel
07-15-2014 09:42 AM
Hi
Could any of you please explain why not using VMWare? Is it possible but not recommended?
03-04-2015 11:01 AM
Top #13
rikmer
03-04-2015 11:01 AM
It is not supported running Centum VP in an virtual environment. Mostly because of this special VNET/IP cards which are not supported by the hypervisors.